Building services in Stafford
House extensions
- Single-storey extensions
- Double-storey extensions
- Side extensions
- Side return extensions
- Wraparound extensions
- Kitchen extensions
- Orangeries
- Glazed and contemporary extensions
- Porches
Loft conversions
- Dormer loft conversions
- Hip-to-gable loft conversions
- Mansard loft conversions
- Rooflight loft conversions
- Bungalow loft conversions
Garage, basement and barn conversions
New build homes
Renovations and structural work
Design and approvals
Guide prices in Stafford
| Project | Guide range (inc VAT) |
|---|---|
| Single-storey extensions | £1,900–£2,800 per m² of floor area |
| Double-storey extensions | £1,600–£2,400 per m² of floor area (both floors) |
| Kitchen extensions | £2,200–£3,300 per m² including a mid-range kitchen |
| House renovations | £850–£1,750 per m² for a medium to full renovation |
| Structural alterations and knock-throughs | £4,250–£9,250 for a typical knock-through with steel beam |
| Porches | £6,250–£15,500 from a 3 m² porch to a small front extension |
Prices in the West Midlands sit near the national average for this kind of work, and the range for Stafford reflects that.
Planning permission in Stafford
In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
About building in Stafford
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
From ST16 outwards, we take on projects throughout Stafford and the surrounding parts of Staffordshire. Stafford has a population of around 70,000.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions from homeowners in Stafford
How much does a loft conversion cost in Stafford?
A rear dormer loft conversion in Stafford typically costs £46,500–£66,000 for a typical rear dormer with en-suite, including VAT.
Is the home visit free?
Yes. The first visit to discuss your project and measure up for a quote is free, with no obligation.
How much does an extension cost in Stafford?
A single-storey extension in Stafford typically costs £1,900–£2,800 per m² of floor area, and a double-storey extension £1,600–£2,400 per m² of floor area (both floors), including VAT.
Do I need planning permission for an extension in Stafford?
In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Do you work in Stafford?
Yes. We take on extensions, loft conversions, conversions, renovations and new builds across Stafford, including postcodes ST16.
