House extensions

A house extension adds floor space without the cost of moving. We design it, sort the approvals and build it under one contract, from the foundations to the final coat of paint.

House extensions
Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

Choose a project

UK guide prices including VAT
ProjectGuide priceTime on site
Single-storey extensions£1,950–£2,900 per m² of floor area10 to 14 weeks on site for a typical rear extension, after approvals
Double-storey extensions£1,650–£2,500 per m² of floor area (both floors)14 to 20 weeks on site, after planning and building control approval
Side extensions£1,700–£2,650 per m² of floor area10 to 16 weeks on site depending on size and storeys
Side return extensions£2,300–£3,300 per m² of floor area10 to 14 weeks on site
Wraparound extensions£2,200–£3,200 per m² of floor area12 to 18 weeks on site
Kitchen extensions£2,250–£3,400 per m² including a mid-range kitchen11 to 16 weeks on site, including kitchen fitting
Orangeries£2,400–£3,400 per m² of floor area8 to 12 weeks on site
Glazed and contemporary extensions£2,800–£4,200 per m² of floor area12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks
Porches£6,500–£16,000 from a 3 m² porch to a small front extension2 to 4 weeks on site

Questions about house extensions

Do I need planning permission for a single-storey extension?

Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.

Does a double-storey extension need planning permission?

Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.

Does a side return extension need planning permission?

It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.

Does a wraparound extension need planning permission?

Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.

Should the kitchen be designed before the extension?

Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.