Article 4 direction
A council order that removes some permitted development rights in a defined area, so works that would normally be allowed need a planning application.
Back addition
The narrower rear wing found on many Victorian and Edwardian terraced houses, usually containing the kitchen and bathroom.
Bifold doors
Glazed doors made of panels that fold against each other to open almost the full width of an opening.
Block and beam floor
A ground floor made of precast concrete beams with concrete blocks between them, often used where ground conditions are poor.
Build-over agreement
Permission from the water company to build over or within 3 metres of a public sewer.
Building control
The service that checks building work meets the building regulations, provided by councils or registered building control approvers.
Building notice
A way of applying for building regulations approval without full plans; suitable for simpler work in England, Wales and Northern Ireland.
Building regulations
National minimum standards for the design and construction of buildings, covering structure, fire safety, energy, ventilation, drainage and more.
Building warrant
In Scotland, the approval from the council that must be granted before most building work starts.
Cavity wall
An external wall built of two leaves of masonry with a gap between them, usually filled or partly filled with insulation.
Completion certificate
The document confirming building work has been inspected and meets the building regulations. Keep it for when you sell.
Conservation area
An area of special architectural or historic interest where extra planning controls apply.
Damp-proof course (DPC)
A horizontal barrier in a wall that stops ground moisture rising.
Damp-proof membrane (DPM)
A sheet laid under a floor slab to stop moisture rising through the floor.
Dormer
A structure that projects from a sloping roof to create headroom and a vertical window.
Eaves
The lower edge of a roof where it overhangs the walls.
First fix
The stage when cables, pipes and studwork are installed before plastering.
Flat roof
A roof with a very shallow fall, typically finished with rubber, felt or GRP membranes over insulation.
Foundations
The base that transfers a building’s load into the ground, usually concrete strip or trench-fill foundations for extensions.
Full plans application
A building regulations application with detailed drawings, checked before work starts.
Gable
The triangular upper part of a wall at the end of a pitched roof.
Hip
The sloping edge where two roof slopes meet at an external angle; a hipped roof slopes on all sides.
Householder application
A planning application for works to a house or its garden, such as an extension.
Juliet balcony
Doors that open inward with a guard rail across the opening, without a platform to step onto.
Larger home extension
An English prior approval route allowing single-storey rear extensions of up to 6 metres (attached) or 8 metres (detached).
Lawful development certificate
A certificate from the council confirming that a use or development is lawful, often used to confirm permitted development.
Lintel
A beam over a door or window opening that carries the wall above.
Consent needed for works that affect the character of a listed building, inside or out.
Mansard
A roof with a steep lower slope (around 72 degrees) and a shallower or flat top, creating an almost full storey.
Padstone
A concrete or engineering-brick block that spreads the load from a beam into the wall below.
Party wall
A wall shared between two properties, or one on the boundary.
Party wall award
A document prepared by party wall surveyors setting out how work under the Party Wall etc. Act 1996 will be carried out.
Permitted development
Works allowed without a planning application under national rules, subject to limits and conditions.
Pitched roof
A roof with sloping surfaces, usually covered in tiles or slates.
Prior approval
A lighter-touch process where the council considers specific matters, such as neighbours’ amenity, before permitted development goes ahead.
Registered building control approver
A private building control body registered with the Building Safety Regulator, an alternative to council building control in England.
Ridge
The horizontal line at the top of a pitched roof where two slopes meet.
Roof lantern
A glazed structure set into a flat roof to bring daylight into the room below.
RSJ (rolled steel joist)
A common term for a steel beam used to support loads when a wall is removed.
Second fix
The stage after plastering when sockets, switches, sanitaryware, doors and skirting are fitted.
Section 106 agreement
A legal agreement attached to a planning permission, often covering contributions to local infrastructure or affordable housing.
Side return
The narrow outdoor passage beside the back addition of a terraced house.
Soil stack
The vertical pipe that carries waste from toilets to the drains.
Steel beam
A structural member, usually a universal beam or column section, carrying loads over a new opening.
Structural calculations
An engineer’s calculations showing that beams, lintels and foundations can carry the loads.
SuDS
Sustainable drainage systems, which manage rainwater on site; in Wales most new buildings need SuDS approval.
Underpinning
Strengthening or deepening existing foundations, often needed for basements or subsidence.
U-value
A measure of heat loss through a building element; the lower the number, the better the insulation.
Warm roof
A roof where the insulation sits above the structure, keeping the timbers warm and reducing condensation risk.
Zero-rated
Supplies charged VAT at 0%, such as the construction of qualifying new homes.