New build homes

New build homes

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

UK guide price

£2,000–£3,200 per m² of floor area (build cost)

A new build home typically costs £2,000–£3,200 per m² of floor area (build cost) across the UK, including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £300,000–£480,000. Build time is usually 9 to 14 months on site for a typical house. Design, structural calculations and council fees are extra.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

Building work on a new dwelling is normally zero-rated for VAT when carried out by a VAT-registered builder, which makes a big difference to the overall budget.

What we handle

  • Site appraisal and feasibility
  • Design and planning application
  • Structural and services design
  • Groundworks, foundations and drainage
  • Superstructure, roof and windows
  • Mechanical and electrical installation
  • Internal fit-out and finishes
  • Building control completion and warranty liaison

Options to consider

Replacement dwelling

Demolish an old house or bungalow and build new.

Garden plot

Build a new house in a large garden, subject to planning.

Self-build support

We build to your architect’s design.

Energy-efficient homes

Heat pumps, high insulation and solar panels designed in.

How much does a new build home cost?

A new build home typically costs £2,000–£3,200 per m² of floor area (build cost) across the UK, including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £300,000–£480,000. Build time is usually 9 to 14 months on site for a typical house. Design, structural calculations and council fees are extra.

Guide price by region, including VAT at 0% (zero-rated for qualifying new dwellings)
RegionGuide range (per m² of floor area (build cost))
London£2,600–£4,150
South East£2,250–£3,600
East of England£2,100–£3,400
South West£2,050–£3,250
West Midlands£1,950–£3,100
East Midlands£1,900–£3,050
North West£1,900–£3,000
Yorkshire and the Humber£1,850–£3,000
North East£1,800–£2,900
Wales£1,850–£2,950
Scotland£1,950–£3,100
Northern Ireland£1,700–£2,750

What changes the price:

  • Size and complexity of the house
  • Ground conditions and foundations
  • Specification and energy systems
  • Services connections
  • Site access and demolition
  • External works and landscaping

Use the guide price tool for a figure based on your measurements, or see all guide prices.

Do I need planning permission?

England

In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Wales

In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.

Scotland

In Scotland a new home needs planning permission and a building warrant before work starts.

Northern Ireland

In Northern Ireland a new home needs planning permission from the council and building control approval.

Even when planning permission is not needed, building regulations approval (a building warrant in Scotland) usually is. We make the applications and book the inspections.

How long does it take?

Typically 9 to 14 months on site for a typical house. Surveys, design and approvals usually take 4 to 9 months beforehand.

How it works

  1. 01

    Free visit

    We look at the property, discuss what you want and measure up.

  2. 02

    Design and fixed quote

    Drawings, calculations and an itemised price for the agreed specification.

  3. 03

    Approvals

    Planning or permitted development, building regulations and neighbour matters.

  4. 04

    Build and sign-off

    Built to a written programme, with a completion certificate at the end.

New build homes: questions and answers

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Start with a free home visit

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price