SK Developments Free home visit0800 088 6248 Get a quote

Prices

Guide prices for building work

UK-wide guide ranges for the building work, including VAT at the rate that normally applies. They are a starting point: your fixed price follows a survey and drawings.

House extensions

ProjectUK guide priceVAT basisTime on site
Single-storey extensions£1,950–£2,900 per m² of floor area20% (standard rate)10 to 14 weeks on site for a typical rear extension, after approvals
Double-storey extensions£1,650–£2,500 per m² of floor area (both floors)20% (standard rate)14 to 20 weeks on site, after planning and building control approval
Side extensions£1,700–£2,650 per m² of floor area20% (standard rate)10 to 16 weeks on site depending on size and storeys
Side return extensions£2,300–£3,300 per m² of floor area20% (standard rate)10 to 14 weeks on site
Wraparound extensions£2,200–£3,200 per m² of floor area20% (standard rate)12 to 18 weeks on site
Kitchen extensions£2,250–£3,400 per m² including a mid-range kitchen20% (standard rate)11 to 16 weeks on site, including kitchen fitting
Orangeries£2,400–£3,400 per m² of floor area20% (standard rate)8 to 12 weeks on site
Glazed and contemporary extensions£2,800–£4,200 per m² of floor area20% (standard rate)12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks
Porches£6,500–£16,000 from a 3 m² porch to a small front extension20% (standard rate)2 to 4 weeks on site

Loft conversions

ProjectUK guide priceVAT basisTime on site
Dormer loft conversions£48,000–£68,000 for a typical rear dormer with en-suite20% (standard rate)6 to 9 weeks on site
Hip-to-gable loft conversions£55,000–£78,000 for a hip-to-gable with rear dormer20% (standard rate)7 to 10 weeks on site
Mansard loft conversions£65,000–£95,000 for a typical rear mansard20% (standard rate)9 to 12 weeks on site, after planning approval
Rooflight loft conversions£30,000–£45,000 for a typical rooflight conversion20% (standard rate)4 to 6 weeks on site
Bungalow loft conversions£45,000–£80,000 for a typical bungalow conversion with dormers20% (standard rate)8 to 14 weeks on site

Garage, basement and barn conversions

ProjectUK guide priceVAT basisTime on site
Garage conversions£18,000–£30,000 for a single integral garage20% (standard rate)3 to 6 weeks on site
Basement conversions£1,900–£3,200 per m² for converting an existing cellar20% (standard rate)8 to 16 weeks for a cellar conversion; longer for new excavation
Barn conversions£1,800–£3,000 per m² of floor areausually 5% (reduced rate for creating a new dwelling)6 to 12 months on site depending on condition
Garden annexes£1,800–£2,800 per m² of floor area20% (standard rate)10 to 16 weeks on site

New build homes

ProjectUK guide priceVAT basisTime on site
New build homes£2,000–£3,200 per m² of floor area (build cost)0% (zero-rated for qualifying new dwellings)9 to 14 months on site for a typical house
Small housing developments£1,800–£2,700 per m² of floor area (build cost)0% (zero-rated for qualifying new dwellings)12 to 24 months depending on scheme size

Renovations and structural work

ProjectUK guide priceVAT basisTime on site
House renovations£900–£1,800 per m² for a medium to full renovation20% (5% may apply to homes empty for two years or more)8 to 20 weeks on site depending on scope
Structural alterations and knock-throughs£4,500–£9,500 for a typical knock-through with steel beam20% (standard rate)1 to 2 weeks on site for a typical knock-through

Design and approvals

ProjectUK guide priceVAT basisTime on site
Architectural design and drawings£1,500–£4,500 for planning and building regulations drawings for a typical extension20% (standard rate)2 to 6 weeks for drawings, depending on complexity
Planning and building regulations£750–£2,500 for application management (council fees extra)20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)about 8 weeks for a householder planning decision (two months in Scotland)

How prices vary by region

Our local pages adjust these guides with the regional factors below. They reflect typical differences in labour and materials, not quotes.

RegionFactor against UK guide
London+30%
South East+12%
East of England+6%
South West+2%
West Midlands-3%
East Midlands-5%
North West-6%
Yorkshire and the Humber-7%
North East-10%
Wales-8%
Scotland-3%
Northern Ireland-14%

What the prices include

Structure and shell, insulation, roof, glazing allowance, steel beams to open up the house, electrics, heating and plastering, and building control. Kitchens, flooring and decoration are included only where the project says so. Design, structural calculations and council fees are extra and shown separately in your quote; drawings for a typical extension are £1,500–£4,500 for planning and building regulations drawings for a typical extension.

Work out a guide price for my home

Start with a free home visit

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price