SK Developments Free home visit0800 088 6248 Get a quote

HampshireArchitectural design and drawings

Architectural design and drawings in Andover

For homeowners in Andover, about 13 miles north-west of Winchester, we handle architectural drawings as a standalone service or as the first stage of a design and build project.

Guide price in Andover

£1,750–£5,000 for planning and building regulations drawings for a typical extension

In Andover, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a set of architectural drawings?

Extension drawings and a floor plan on a desk with a scale ruler and a white model house

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.

How much does a set of architectural drawings cost in Andover?

In Andover, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Council application fees are extra.

Guide prices for Andover, including VAT at 20% (standard rate)
Size or typeGuide range
Planning and building regulations drawings for a typical extension£1,750–£5,000
Larger or more complex projects£5,000–£6,250

Your quote will depend mainly on:

  • Number of design options
  • Structural engineer’s fees
  • Planning or building regulations stage
  • Project size and complexity

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Planning and building regulations in Andover

Whether you need planning permission depends on your house and its location in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical set of architectural drawings we handle:

  • Planning drawings: plans, elevations, site and location plans
  • 3D views on request
  • Design options and sketch layouts
  • Tender-ready drawing pack
  • Measured survey of the existing house
  • Structural calculations coordinated

How long does it take?

Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Andover

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

Our Andover coverage includes postcode districts SP10, and we also work in nearby places such as Winchester, Newbury and Salisbury.

How it works

  1. 01

    Survey and brief

    We visit, talk through what you want and record the existing building.

  2. 02

    Concept design

    Options for layout and appearance, revised until you are happy.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Approval

    We follow the application through to a decision and pass on the approved drawings.

Questions about architectural drawings in Andover

What are building regulations drawings?

More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.

How much does a set of architectural drawings cost in Andover?

In Andover, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Do you prepare architectural drawings in Andover?

Yes. We prepare architectural drawings across Andover, including postcodes SP10. Every project starts with a free home visit.

What drawings are needed for planning?

Usually existing and proposed floor plans and elevations, a block plan and a location plan. Some councils need more.

How long do drawings take?

Typically 2 to 6 weeks from survey, depending on revisions.

Tell us about your project in Andover and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price