SK Developments Free home visit0800 088 6248 Get a quote

SomersetArchitectural design and drawings

Architectural design and drawings in Clevedon

Need architectural drawings in Clevedon? We survey the house, prepare the drawings with the architectural technicians we work with and coordinate the structural calculations.

Guide price in Clevedon

£1,500–£4,500 for planning and building regulations drawings for a typical extension

In Clevedon, a set of architectural drawings typically costs £1,500–£4,500 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a set of architectural drawings?

Extension drawings and a floor plan on a desk with a scale ruler and a white model house

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.

How much does a set of architectural drawings cost in Clevedon?

In Clevedon, a set of architectural drawings typically costs £1,500–£4,500 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Building costs in the South West are close to the UK average, so the figures for Clevedon are close to our national guide. Council application fees are extra.

Guide prices for Clevedon, including VAT at 20% (standard rate)
Size or typeGuide range
Planning and building regulations drawings for a typical extension£1,500–£4,500
Larger or more complex projects£4,500–£5,500

The main things that change the cost:

  • Number of design options
  • 3D visuals
  • Planning or building regulations stage
  • Measured survey complexity

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Planning and building regulations in Clevedon

Whether you need planning permission depends on your house and its location in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical set of architectural drawings we handle:

  • 3D views on request
  • Tender-ready drawing pack
  • Planning drawings: plans, elevations, site and location plans
  • Design options and sketch layouts
  • Structural calculations coordinated
  • Measured survey of the existing house

How long does it take?

Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Clevedon

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

If your home is in Clevedon or close by in Nailsea, Portishead and Weston-super-Mare, a free home visit is the first step.

How it works

  1. 01

    Measured survey

    We visit and measure the house so the drawings start from accurate information.

  2. 02

    Concept design

    Options for layout and appearance, revised until you are happy.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about architectural drawings in Clevedon

Do you prepare architectural drawings in Clevedon?

Yes. We prepare architectural drawings across Clevedon, including postcodes BS21. Every project starts with a free home visit.

Can I use the drawings with another builder?

Yes. Drawings you pay for are yours to use for the project.

How long do drawings take?

Typically 2 to 6 weeks from survey, depending on revisions.

Do I need an architect?

Not necessarily. For extensions and lofts, an architectural technician’s drawings are common. For complex or sensitive sites, an architect may be better.

How much does a set of architectural drawings cost in Clevedon?

In Clevedon, a set of architectural drawings typically costs £1,500–£4,500 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Ready to talk about a set of architectural drawings in Clevedon? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price