What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in East Grinstead?
In East Grinstead, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for East Grinstead. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,750–£5,000 |
| Larger or more complex projects | £5,000–£6,250 |
What moves the price most:
- Measured survey complexity
- 3D visuals
- Number of design options
- Structural engineer’s fees
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in East Grinstead
Whether you need planning permission depends on your house and its location in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most architectural drawings:
- Measured survey of the existing house
- Party wall drawings where needed
- Structural calculations coordinated
- Planning drawings: plans, elevations, site and location plans
- Tender-ready drawing pack
- Building regulations drawings and specification
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in East Grinstead
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
From RH19 outwards, we take on projects throughout East Grinstead and the surrounding parts of West Sussex.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about architectural drawings in East Grinstead
Can I use the drawings with another builder?
Yes. Drawings you pay for are yours to use for the project.
Do you prepare architectural drawings in East Grinstead?
Yes. We prepare architectural drawings across East Grinstead, including postcodes RH19. Every project starts with a free home visit.
What are building regulations drawings?
More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
How much does a set of architectural drawings cost in East Grinstead?
In East Grinstead, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
