What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Teddington?
In Teddington, a set of architectural drawings typically costs £2,000–£5,750 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). The guide for Teddington reflects typical costs in London, roughly 30% above the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £2,000–£5,750 |
| Larger or more complex projects | £5,750–£7,250 |
What moves the price most:
- Planning or building regulations stage
- 3D visuals
- Measured survey complexity
- Project size and complexity
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Teddington
Approvals for a set of architectural drawings in Teddington follow the rules for England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Structural calculations coordinated
- Planning drawings: plans, elevations, site and location plans
- Design options and sketch layouts
- Measured survey of the existing house
- 3D views on request
- Building regulations drawings and specification
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Teddington
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
If your home is in Teddington or close by in Kingston upon Thames, Twickenham and East Molesey, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about architectural drawings in Teddington
How much does a set of architectural drawings cost in Teddington?
In Teddington, a set of architectural drawings typically costs £2,000–£5,750 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.
Do you prepare architectural drawings in Teddington?
Yes. We prepare architectural drawings across Teddington, including postcodes TW11. Every project starts with a free home visit.
Do I need an architect?
Not necessarily. For extensions and lofts, an architectural technician’s drawings are common. For complex or sensitive sites, an architect may be better.
What are building regulations drawings?
More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.
