What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Troon?
In Troon, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Building costs in Scotland are close to the UK average, so the figures for Troon are close to our national guide. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,500–£4,250 |
| Larger or more complex projects | £4,250–£5,250 |
Your quote will depend mainly on:
- Structural engineer’s fees
- 3D visuals
- Number of design options
- Measured survey complexity
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Troon
Here is how the rules work for a set of architectural drawings in Scotland. In Scotland drawings are prepared for the planning application and the building warrant, which must be granted before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most architectural drawings:
- Measured survey of the existing house
- Written agreement with neighbours on shared walls
- Building regulations drawings and specification
- 3D views on request
- Planning drawings: plans, elevations, site and location plans
- Tender-ready drawing pack
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Troon
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
We work across Troon and neighbouring areas such as Prestwick, Irvine and Ayr. Postcodes we cover in Troon include KA10.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about architectural drawings in Troon
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
What are building regulations drawings?
More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.
Do you prepare architectural drawings in Troon?
Yes. We prepare architectural drawings across Troon, including postcodes KA10. Every project starts with a free home visit.
How much does a set of architectural drawings cost in Troon?
In Troon, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
