What is a barn conversion?

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.
How much does a barn conversion cost in Gloucestershire?
In Gloucestershire, a barn conversion typically costs £1,850–£3,050 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £277,500–£457,500. Building costs in the South West are close to the UK average, so the figures for Gloucestershire are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£320,000 |
| Typical project (150 m²) | £277,500–£457,500 |
| Larger project (210 m²) | £388,500–£640,500 |
| Rate per m² | £1,850–£3,050 |
The main things that change the cost:
- Services and drainage
- Glazing and finishes
- Planning conditions and ecology
- Insulation approach
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a barn conversion in Gloucestershire?
Whether you need planning permission depends on your house and its location in England. In England converting an agricultural building into a home needs either full planning permission or prior approval under Class Q of the permitted development rules, which limits floor space and the number of homes. Listed barns also need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a barn conversion:
- Structural repairs and new floor slab
- Building control completion
- Insulation that respects the existing fabric
- Structural survey and feasibility
- New roof covering where needed
- Services, drainage and septic or treatment plant
How long does it take?
The build itself usually takes 6 to 12 months on site depending on condition. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Gloucestershire
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Towns we cover in Gloucestershire include Gloucester, Cheltenham, Stroud, Kingswood, Mangotsfield and Yate.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about barn conversions in Gloucestershire
What about drainage without mains sewer?
A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.
How much does a barn conversion cost in Gloucestershire?
In Gloucestershire, a barn conversion typically costs £1,850–£3,050 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £277,500–£457,500. Your fixed price depends on the survey and drawings.
Can I get a mortgage for a barn conversion?
Specialist self-build and conversion mortgages release money in stages. We can provide the staged costings lenders ask for.
Is VAT reduced on a barn conversion?
Usually yes. Converting a non-residential building into a dwelling normally qualifies for the reduced 5% VAT rate on building work. Our guide prices assume this rate.
How long does a barn conversion take in Gloucestershire?
Typically 6 to 12 months on site depending on condition. Design and approvals beforehand usually take 4 to 9 months.