What is a barn conversion?

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.
How much does a barn conversion cost in St Austell?
In St Austell, a barn conversion typically costs £1,850–£3,050 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £277,500–£457,500. Building costs in the South West are close to the UK average, so the figures for St Austell are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£320,000 |
| Typical project (150 m²) | £277,500–£457,500 |
| Larger project (210 m²) | £388,500–£640,500 |
| Rate per m² | £1,850–£3,050 |
What moves the price most:
- Glazing and finishes
- Insulation approach
- Services and drainage
- Planning conditions and ecology
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a barn conversion in St Austell?
Before anything is built in St Austell, we confirm which approvals apply in England. In England converting an agricultural building into a home needs either full planning permission or prior approval under Class Q of the permitted development rules, which limits floor space and the number of homes. Listed barns also need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical barn conversion we handle:
- Structural repairs and new floor slab
- Structural survey and feasibility
- Planning or prior approval application
- Services, drainage and septic or treatment plant
- Ecology and bat survey coordination
- New roof covering where needed
How long does it take?
The build itself usually takes 6 to 12 months on site depending on condition. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in St Austell
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
St Austell sits in Cornwall, about 14 miles north-east of Truro. We cover the whole of St Austell, including postcodes PL25.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about barn conversions in St Austell
How much does a barn conversion cost in St Austell?
In St Austell, a barn conversion typically costs £1,850–£3,050 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £277,500–£457,500. Your fixed price depends on the survey and drawings.
How long does a barn conversion take in St Austell?
Typically 6 to 12 months on site depending on condition. Design and approvals beforehand usually take 4 to 9 months.
Can I get a mortgage for a barn conversion?
Specialist self-build and conversion mortgages release money in stages. We can provide the staged costings lenders ask for.
Do I need planning permission for a barn conversion?
Yes. A barn conversion needs planning permission or, in England only, prior approval under the agricultural permitted development rules where the building qualifies. Listed barns also need listed building consent.
What about drainage without mains sewer?
A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.
