SK Developments Free home visit0800 088 6248 Get a quote

HampshireBarn conversions

Barn conversions in Yateley

Planning a barn conversion in Yateley? We look at the site, coordinate the design and approvals, and build it under one contract.

Guide price in Yateley

£2,000–£3,350 per m² of floor area

In Yateley, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £300,000–£502,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a barn conversion?

Converted red-brick barn with a full-height glazed opening and gravel courtyard at sunset

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.

How much does a barn conversion cost in Yateley?

In Yateley, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £300,000–£502,500. Building costs in the South East run about 12% above the UK average, and the figures for Yateley are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for Yateley, including VAT at usually 5% (reduced rate for creating a new dwelling)
Size or typeGuide range
Smaller project (105 m²)£210,000–£352,000
Typical project (150 m²)£300,000–£502,500
Larger project (210 m²)£420,000–£703,500
Rate per m²£2,000–£3,350

The main things that change the cost:

  • Access to the site
  • Glazing and finishes
  • Planning conditions and ecology
  • Services and drainage

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a barn conversion in Yateley?

Whether you need planning permission depends on your house and its location in England. In England converting an agricultural building into a home needs either full planning permission or prior approval under Class Q of the permitted development rules, which limits floor space and the number of homes. Listed barns also need listed building consent.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

What we take care of:

  • Ecology and bat survey coordination
  • New roof covering where needed
  • Building control completion
  • Planning or prior approval application
  • Insulation that respects the existing fabric
  • Structural repairs and new floor slab

How long does it take?

Build time is typically 6 to 12 months on site depending on condition. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Yateley

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

Projects in Yateley (GU46) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about barn conversions in Yateley

What about drainage without mains sewer?

A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.

How much does a barn conversion cost in Yateley?

In Yateley, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £300,000–£502,500. Your fixed price depends on the survey and drawings.

Do you build barn conversions in Yateley?

Yes. We build barn conversions across Yateley, including postcodes GU46. Every project starts with a free home visit.

How long does a barn conversion take?

Typically 6 to 12 months on site, depending on the building’s condition.

Do I need a bat survey?

Very often. Barns are common bat roosts, and planning authorities usually ask for an ecology survey.

Ready to talk about a barn conversion in Yateley? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price