What is a basement conversion?

A basement conversion turns an existing cellar into living space, or excavates a new basement under the house or garden. Waterproofing, structural support and daylight are the main design challenges.
How much does a basement conversion cost in Lanarkshire?
In Lanarkshire, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). For a typical 30 m² project that is roughly £55,500–£93,000. Prices in Scotland sit near the national average for this kind of work, and the range for Lanarkshire reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (21 m²) | £39,000–£65,000 |
| Typical project (30 m²) | £55,500–£93,000 |
| Larger project (42 m²) | £77,500–£130,000 |
| Rate per m² | £1,850–£3,100 |
The biggest cost drivers are:
- Ground water and access
- Agreements with neighbours on shared walls
- Waterproofing system
- Lightwells
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a basement conversion in Lanarkshire?
Approvals for a basement conversion in Lanarkshire follow the rules for Scotland. In Scotland converting an existing cellar may not need planning permission, but a building warrant is needed, and new excavation usually needs planning permission.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off
- Underpinning or new structure where needed
- Lightwells and windows
- Electrics, heating and plastering
- Written agreement with neighbours on shared walls
- Structural and ground survey
How long does it take?
The build itself usually takes 8 to 16 weeks for a cellar conversion; longer for new excavation. Allow time beforehand for drawings and approvals, usually 3 to 5 months.
Building in Lanarkshire
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Towns we cover in Lanarkshire include East Kilbride, Hamilton, Cumbernauld, Coatbridge, Airdrie and Motherwell.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about basement conversions in Lanarkshire
Do you build basement conversions in Lanarkshire?
Yes. We build basement conversions across Lanarkshire, including postcodes EH46, EH55, G33, G65 and G66. Every project starts with a free home visit.
How long does it take?
A cellar conversion takes around 8 to 16 weeks; new basements take longer.
How much does a basement conversion cost in Lanarkshire?
In Lanarkshire, a basement conversion typically costs £1,850–£3,100 per m² for converting an existing cellar, including VAT at 20% (standard rate). A typical 30 m² project comes to roughly £55,500–£93,000. Your fixed price depends on the survey and drawings.
Is new excavation worth it?
It can be in high-value areas, but costs are high. We give a feasibility view before design starts.
How do you keep a basement dry?
With a waterproofing system designed to BS 8102, typically a cavity drain membrane with a sump pump, or a tanking system.
Do I need planning permission for a basement conversion in Lanarkshire?
In Scotland converting an existing cellar may not need planning permission, but a building warrant is needed, and new excavation usually needs planning permission.