What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Caerphilly?
In Caerphilly, a dormer loft conversion typically costs £44,000–£62,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Caerphilly. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £44,000–£62,500 |
| Higher specification | £62,500–£78,000 |
What moves the price most:
- Scaffolding and access
- En-suite or bathroom
- Staircase position
- Dormer size and roof structure
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a dormer loft conversion in Caerphilly?
Before anything is built in Caerphilly, we confirm which approvals apply in Wales. In Wales roof enlargements such as rear dormers can be permitted development within volume limits and design conditions. Dormers facing a road, balconies and conservation-area work need permission.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a dormer loft conversion:
- Dormer structure, roof covering and windows
- Measured survey and head-height check
- Building control completion certificate
- New staircase and fire-safe escape route
- Party wall notices for shared walls
- Insulation, plastering, electrics and plumbing
How long does it take?
Allow 6 to 9 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Caerphilly
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
From CF83 outwards, we take on projects throughout Caerphilly and the surrounding parts of Mid Glamorgan.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about dormer loft conversions in Caerphilly
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
How much does a dormer loft conversion cost in Caerphilly?
In Caerphilly, a dormer loft conversion typically costs £44,000–£62,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
How long does a dormer loft conversion take in Caerphilly?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need planning permission for a dormer loft conversion in Caerphilly?
In Wales roof enlargements such as rear dormers can be permitted development within volume limits and design conditions. Dormers facing a road, balconies and conservation-area work need permission.
