What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Eastleigh?
In Eastleigh, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £54,000–£76,000 |
| Higher specification | £76,000–£95,000 |
Your quote will depend mainly on:
- Dormer size and roof structure
- Fire safety upgrades to the existing house
- En-suite or bathroom
- Scaffolding and access
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a dormer loft conversion in Eastleigh?
Whether you need planning permission depends on your house and its location in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most dormer loft conversions:
- Party wall notices for shared walls
- Dormer structure, roof covering and windows
- New staircase and fire-safe escape route
- Insulation, plastering, electrics and plumbing
- Drawings and structural calculations
- Steel beams and new floor joists
How long does it take?
Expect 6 to 9 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Eastleigh
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Eastleigh sits in Hampshire, about 7 miles south of Winchester. We cover the whole of Eastleigh, including postcodes SO50 and SO97.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about dormer loft conversions in Eastleigh
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
How much does a dormer loft conversion cost in Eastleigh?
In Eastleigh, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Does a dormer loft conversion need planning permission?
A rear dormer is often permitted development in England, provided the extra roof volume is within 40 cubic metres on a terraced house or 50 on a semi-detached or detached house, and it does not face the road. Front dormers and houses in conservation areas usually need an application.
Do I need a party wall agreement?
In England and Wales, if the conversion cuts into or builds on a shared wall, notices must be served under the Party Wall etc. Act 1996.
How long does a dormer loft conversion take in Eastleigh?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.