What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Egham?
In Egham, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £54,000–£76,000 |
| Higher specification | £76,000–£95,000 |
What moves the price most:
- En-suite or bathroom
- Scaffolding and access
- Fire safety upgrades to the existing house
- Built-in storage and finishes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a dormer loft conversion in Egham?
Approvals for a dormer loft conversion in Egham follow the rules for England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most dormer loft conversions:
- Drawings and structural calculations
- Dormer structure, roof covering and windows
- Insulation, plastering, electrics and plumbing
- Building control completion certificate
- Measured survey and head-height check
- Party wall notices for shared walls
How long does it take?
Expect 6 to 9 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Egham
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
If your home is in Egham or close by in Staines, Ashford and Windsor, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about dormer loft conversions in Egham
How much does a dormer loft conversion cost in Egham?
In Egham, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
How long does a dormer loft conversion take in Egham?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.