What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Greenwich?
In Greenwich, a dormer loft conversion typically costs £62,500–£88,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). The guide for Greenwich reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £62,500–£88,500 |
| Higher specification | £88,500–£110,500 |
What moves the price most:
- Dormer size and roof structure
- Fire safety upgrades to the existing house
- En-suite or bathroom
- Built-in storage and finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a dormer loft conversion in Greenwich?
Approvals for a dormer loft conversion in Greenwich follow the rules for England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Measured survey and head-height check
- New staircase and fire-safe escape route
- Building control completion certificate
- Party wall notices for shared walls
- Drawings and structural calculations
- Steel beams and new floor joists
How long does it take?
Allow 6 to 9 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Greenwich
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
If your home is in Greenwich or close by in Blackheath, Lewisham and Catford, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about dormer loft conversions in Greenwich
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
Do I need a party wall agreement?
In England and Wales, if the conversion cuts into or builds on a shared wall, notices must be served under the Party Wall etc. Act 1996.
How long does a dormer loft conversion take in Greenwich?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a dormer loft conversion cost in Greenwich?
In Greenwich, a dormer loft conversion typically costs £62,500–£88,500 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.
