SK Developments Free home visit0800 088 6248 Get a quote

KentDormer loft conversions

Dormer loft conversions in Strood

A dormer loft conversion in Strood starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in Strood

£54,000–£76,000 for a typical rear dormer with en-suite

In Strood, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a dormer loft conversion?

Full-width rear dormer loft conversion clad in dark tiles on a brick terraced house

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.

How much does a dormer loft conversion cost in Strood?

In Strood, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). The guide for Strood reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Strood, including VAT at 20% (standard rate)
Size or typeGuide range
A typical rear dormer with en-suite£54,000–£76,000
Higher specification£76,000–£95,000

The main things that change the cost:

  • Built-in storage and finishes
  • En-suite or bathroom
  • Fire safety upgrades to the existing house
  • Staircase position

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a dormer loft conversion in Strood?

Before anything is built in Strood, we confirm which approvals apply in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Insulation, plastering, electrics and plumbing
  • Steel beams and new floor joists
  • Measured survey and head-height check
  • Drawings and structural calculations
  • Dormer structure, roof covering and windows
  • New staircase and fire-safe escape route

How long does it take?

Build time is typically 6 to 9 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.

Building in Strood

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

Projects in Strood (ME2) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about dormer loft conversions in Strood

Will I need to move out?

No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.

How long does it take?

Usually 6 to 9 weeks on site.

Do you build dormer loft conversions in Strood?

Yes. We build dormer loft conversions across Strood, including postcodes ME2. Every project starts with a free home visit.

Do I need a party wall agreement?

In England and Wales, if the conversion cuts into or builds on a shared wall, notices must be served under the Party Wall etc. Act 1996.

How much does a dormer loft conversion cost in Strood?

In Strood, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Tell us about your project in Strood and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price