What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in West Sussex?
In West Sussex, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £54,000–£76,000 |
| Higher specification | £76,000–£95,000 |
What moves the price most:
- En-suite or bathroom
- Dormer size and roof structure
- Scaffolding and access
- Built-in storage and finishes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a dormer loft conversion in West Sussex?
Whether you need planning permission depends on your house and its location in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a dormer loft conversion:
- Measured survey and head-height check
- Drawings and structural calculations
- New staircase and fire-safe escape route
- Building control completion certificate
- Dormer structure, roof covering and windows
- Insulation, plastering, electrics and plumbing
How long does it take?
Allow 6 to 9 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in West Sussex
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Towns we cover in West Sussex include Crawley, Worthing, Bognor Regis, Littlehampton, Horsham and Haywards Heath.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about dormer loft conversions in West Sussex
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
How much does a dormer loft conversion cost in West Sussex?
In West Sussex, a dormer loft conversion typically costs £54,000–£76,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
How long does a dormer loft conversion take in West Sussex?
Typically 6 to 9 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
Will I need to move out?
No. Most of the work is done from scaffolding and the roof. The new staircase is formed near the end, which causes a few days of disruption.