What is a dormer loft conversion?

A dormer loft conversion adds a box-shaped structure to the rear roof slope, creating vertical walls and full headroom across most of the new room. It is the most common loft conversion in the UK because it works on terraced, semi-detached and detached houses.
How much does a dormer loft conversion cost in Wilmslow?
In Wilmslow, a dormer loft conversion typically costs £45,000–£64,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Building costs in the North West run about 6% below the UK average, and the figures for Wilmslow are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rear dormer with en-suite | £45,000–£64,000 |
| Higher specification | £64,000–£80,000 |
The main things that change the cost:
- Staircase position
- Fire safety upgrades to the existing house
- Scaffolding and access
- En-suite or bathroom
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a dormer loft conversion in Wilmslow?
Before anything is built in Wilmslow, we confirm which approvals apply in England. In England a rear dormer is often permitted development if the extra roof volume is no more than 40 cubic metres on a terraced house or 50 on other houses, it does not face the road, sits no higher than the ridge and is set back from the eaves, with matching materials and obscure-glazed side windows. Balconies, front dormers and work in conservation areas need planning permission.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Drawings and structural calculations
- Building control completion certificate
- Steel beams and new floor joists
- New staircase and fire-safe escape route
- Dormer structure, roof covering and windows
- Measured survey and head-height check
How long does it take?
Expect 6 to 9 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Wilmslow
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Projects in Wilmslow (SK9) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about dormer loft conversions in Wilmslow
How much does a dormer loft conversion cost in Wilmslow?
In Wilmslow, a dormer loft conversion typically costs £45,000–£64,000 for a typical rear dormer with en-suite, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How much head height do I need?
Ideally at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. Less can still work with a dormer, but we check this at the survey.
Do you build dormer loft conversions in Wilmslow?
Yes. We build dormer loft conversions across Wilmslow, including postcodes SK9. Every project starts with a free home visit.
What fire safety is required?
Building regulations require a safe escape route. Converting a two-storey house to three storeys usually means a protected stairway with fire doors to habitable rooms and mains-wired smoke alarms.
How long does it take?
Usually 6 to 9 weeks on site.