What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Ashington?
In Ashington, a double-storey extension typically costs £1,500–£2,250 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £54,000–£81,000. Building costs in the North East run about 10% below the UK average, and the figures for Ashington are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £37,500–£56,000 |
| Typical project (36 m²) | £54,000–£81,000 |
| Larger project (50 m²) | £75,000–£112,500 |
| Rate per m² | £1,500–£2,250 |
What moves the price most:
- Brick matching and external finishes
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Ashington?
Approvals for a double-storey extension in Ashington follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical double-storey extension we handle:
- Brick or block walls, floors and a roof tied into the house
- Building control sign-off
- Opening up at both levels with steel beams
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Ashington
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
If your home is in Ashington or close by in Bedlington, Blyth and Cramlington, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Ashington
How much does a double-storey extension cost in Ashington?
In Ashington, a double-storey extension typically costs £1,500–£2,250 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £54,000–£81,000. Your fixed price depends on the survey and drawings.
Do you build double-storey extensions in Ashington?
Yes. We build double-storey extensions across Ashington, including postcodes NE63. Every project starts with a free home visit.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.