What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Beverley?
In Beverley, a double-storey extension typically costs £1,550–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£83,000. That range is adjusted for Yorkshire and the Humber, where domestic building work typically costs around 7% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£57,500 |
| Typical project (36 m²) | £56,000–£83,000 |
| Larger project (50 m²) | £77,500–£115,000 |
| Rate per m² | £1,550–£2,300 |
What moves the price most:
- Steel beams where walls are opened up
- Bathrooms or en-suites on the first floor
- Brick matching and external finishes
- Total floor area across both floors
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Beverley?
Approvals for a double-storey extension in Beverley follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most double-storey extensions:
- Electrics, heating, plumbing and plastering
- Building control sign-off
- Windows, doors and staircase alterations
- Design drawings and planning application
- Structural engineer’s calculations
- Foundations, drainage and scaffolding
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Beverley
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
Beverley sits in the East Riding of Yorkshire. We cover the whole of Beverley, including postcodes HU17.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Beverley
Do you build double-storey extensions in Beverley?
Yes. We build double-storey extensions across Beverley, including postcodes HU17. Every project starts with a free home visit.
How much does a double-storey extension cost in Beverley?
In Beverley, a double-storey extension typically costs £1,550–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£83,000. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.