What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Christchurch?
In Christchurch, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000. Prices in the South West sit near the national average for this kind of work, and the range for Christchurch reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £42,500–£64,000 |
| Typical project (36 m²) | £61,000–£92,000 |
| Larger project (50 m²) | £85,000–£127,500 |
| Rate per m² | £1,700–£2,550 |
The main things that change the cost:
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Brick matching and external finishes
- Roof design and how it joins the existing roof
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a double-storey extension in Christchurch?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Structural engineer’s calculations
- Design drawings and planning application
- Windows, doors and staircase alterations
- Brick or block walls, floors and a roof tied into the house
- Opening up at both levels with steel beams
- Foundations, drainage and scaffolding
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Christchurch
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
We work across Christchurch and neighbouring areas such as Bournemouth, New Milton and Poole. Postcodes we cover in Christchurch include BH23.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Christchurch
How much does a double-storey extension cost in Christchurch?
In Christchurch, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £61,000–£92,000. Your fixed price depends on the survey and drawings.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How long does a double-storey extension take in Christchurch?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.