What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Deeside?
In Deeside, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £54,000–£83,000. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £37,500–£57,500 |
| Typical project (36 m²) | £54,000–£83,000 |
| Larger project (50 m²) | £75,000–£115,000 |
| Rate per m² | £1,500–£2,300 |
Your quote will depend mainly on:
- Brick matching and external finishes
- Scaffolding and access to the rear
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Deeside?
Whether you need planning permission depends on your house and its location in Wales. In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Structural engineer’s calculations
- Opening up at both levels with steel beams
- Windows, doors and staircase alterations
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
- Brick or block walls, floors and a roof tied into the house
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Deeside
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Projects in Deeside (CH5) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Deeside
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Do I need planning permission for a double-storey extension in Deeside?
In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
How much does a double-storey extension cost in Deeside?
In Deeside, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £54,000–£83,000. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How long does a double-storey extension take in Deeside?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.