What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Gainsborough?
In Gainsborough, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£86,500. Building costs in the East Midlands run about 5% below the UK average, and the figures for Gainsborough are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£60,000 |
| Typical project (36 m²) | £56,000–£86,500 |
| Larger project (50 m²) | £77,500–£120,000 |
| Rate per m² | £1,550–£2,400 |
Your quote will depend mainly on:
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
- Total floor area across both floors
- Steel beams where walls are opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Gainsborough?
Whether you need planning permission depends on your house and its location in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Electrics, heating, plumbing and plastering
- Design drawings and planning application
- Brick or block walls, floors and a roof tied into the house
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
- Opening up at both levels with steel beams
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Gainsborough
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
From DN21 outwards, we take on projects throughout Gainsborough and the surrounding parts of Lincolnshire.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Gainsborough
Do you build double-storey extensions in Gainsborough?
Yes. We build double-storey extensions across Gainsborough, including postcodes DN21. Every project starts with a free home visit.
How much does a double-storey extension cost in Gainsborough?
In Gainsborough, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£86,500. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.