What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Harlow?
In Harlow, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £63,000–£95,500. The guide for Harlow reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £44,000–£66,000 |
| Typical project (36 m²) | £63,000–£95,500 |
| Larger project (50 m²) | £87,500–£132,500 |
| Rate per m² | £1,750–£2,650 |
What moves the price most:
- Roof design and how it joins the existing roof
- Steel beams where walls are opened up
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Harlow?
The approval route for Harlow is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Design drawings and planning application
- Brick or block walls, floors and a roof tied into the house
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
- Structural engineer’s calculations
- Building control sign-off
How long does it take?
Expect 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Harlow
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Our Harlow coverage includes postcode districts CM17, CM18 and CM92, and we also work in nearby places such as Hoddesdon, Bishops Stortford and Waltham Abbey.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Harlow
How much does a double-storey extension cost in Harlow?
In Harlow, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £63,000–£95,500. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
How long does a double-storey extension take in Harlow?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.