What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Heanor?
In Heanor, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£86,500. Building costs in the East Midlands run about 5% below the UK average, and the figures for Heanor are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£60,000 |
| Typical project (36 m²) | £56,000–£86,500 |
| Larger project (50 m²) | £77,500–£120,000 |
| Rate per m² | £1,550–£2,400 |
The biggest cost drivers are:
- Total floor area across both floors
- Roof design and how it joins the existing roof
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a double-storey extension in Heanor?
Before anything is built in Heanor, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Building control sign-off
- Design drawings and planning application
- Structural engineer’s calculations
- Electrics, heating, plumbing and plastering
- Foundations, drainage and scaffolding
- Opening up at both levels with steel beams
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Heanor
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Heanor sits in Derbyshire, about 8 miles north-east of Derby. We cover the whole of Heanor, including postcodes DE75.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Heanor
How much does a double-storey extension cost in Heanor?
In Heanor, a double-storey extension typically costs £1,550–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£86,500. Your fixed price depends on the survey and drawings.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Who approves a double-storey extension in Heanor?
Planning matters in Heanor go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.