What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Helensburgh?
In Helensburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Prices in Scotland sit near the national average for this kind of work, and the range for Helensburgh reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £40,000–£60,000 |
| Typical project (36 m²) | £57,500–£86,500 |
| Larger project (50 m²) | £80,000–£120,000 |
| Rate per m² | £1,600–£2,400 |
What moves the price most:
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
- Brick matching and external finishes
- Steel beams where walls are opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Helensburgh?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a double-storey extension:
- Building control sign-off
- Structural engineer’s calculations
- Design drawings and planning application
- Windows, doors and staircase alterations
- Electrics, heating, plumbing and plastering
- Opening up at both levels with steel beams
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Helensburgh
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
From G84 outwards, we take on projects throughout Helensburgh and the surrounding parts of Argyll and Bute.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Helensburgh
Do I need planning permission for a double-storey extension in Helensburgh?
In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How much does a double-storey extension cost in Helensburgh?
In Helensburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
How long does a double-storey extension take in Helensburgh?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.