What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in High Wycombe?
In High Wycombe, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £66,500–£101,000. Building costs in the South East run about 12% above the UK average, and the figures for High Wycombe are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £46,000–£70,000 |
| Typical project (36 m²) | £66,500–£101,000 |
| Larger project (50 m²) | £92,500–£140,000 |
| Rate per m² | £1,850–£2,800 |
What moves the price most:
- Scaffolding and access to the rear
- Steel beams where walls are opened up
- Total floor area across both floors
- Roof design and how it joins the existing roof
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in High Wycombe?
Approvals for a double-storey extension in High Wycombe follow the rules for England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Opening up at both levels with steel beams
- Foundations, drainage and scaffolding
- Brick or block walls, floors and a roof tied into the house
- Electrics, heating, plumbing and plastering
- Structural engineer’s calculations
- Design drawings and planning application
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in High Wycombe
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
From HP13 outwards, we take on projects throughout High Wycombe and the surrounding parts of Buckinghamshire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in High Wycombe
How much does a double-storey extension cost in High Wycombe?
In High Wycombe, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £66,500–£101,000. Your fixed price depends on the survey and drawings.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How long does a double-storey extension take in High Wycombe?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.