What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Kidsgrove?
In Kidsgrove, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£84,500. The guide for Kidsgrove reflects typical costs in the North West, roughly 6% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£59,000 |
| Typical project (36 m²) | £56,000–£84,500 |
| Larger project (50 m²) | £77,500–£117,500 |
| Rate per m² | £1,550–£2,350 |
The biggest cost drivers are:
- Scaffolding and access to the rear
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Kidsgrove?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Design drawings and planning application
- Electrics, heating, plumbing and plastering
- Brick or block walls, floors and a roof tied into the house
- Building control sign-off
- Foundations, drainage and scaffolding
- Windows, doors and staircase alterations
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Kidsgrove
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
We work across Kidsgrove and neighbouring areas such as Congleton, Stoke-on-Trent and Crewe. Postcodes we cover in Kidsgrove include ST7.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Kidsgrove
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
How long does a double-storey extension take in Kidsgrove?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
How much does a double-storey extension cost in Kidsgrove?
In Kidsgrove, a double-storey extension typically costs £1,550–£2,350 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£84,500. Your fixed price depends on the survey and drawings.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
