What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Kilwinning?
In Kilwinning, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Prices in Scotland sit near the national average for this kind of work, and the range for Kilwinning reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £40,000–£60,000 |
| Typical project (36 m²) | £57,500–£86,500 |
| Larger project (50 m²) | £80,000–£120,000 |
| Rate per m² | £1,600–£2,400 |
What moves the price most:
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
- Steel beams where walls are opened up
- Total floor area across both floors
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Kilwinning?
Before anything is built in Kilwinning, we confirm which approvals apply in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical double-storey extension we handle:
- Structural engineer’s calculations
- Electrics, heating, plumbing and plastering
- Building control sign-off
- Opening up at both levels with steel beams
- Design drawings and planning application
- Windows, doors and staircase alterations
How long does it take?
Allow 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Kilwinning
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
We work across Kilwinning and neighbouring areas such as Irvine, Saltcoats and Troon. Postcodes we cover in Kilwinning include KA13.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Kilwinning
How much does a double-storey extension cost in Kilwinning?
In Kilwinning, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How close can it be to my neighbour?
Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.
Who approves a double-storey extension in Kilwinning?
Planning matters in Kilwinning go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Do I need planning permission for a double-storey extension in Kilwinning?
In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.