What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Larne?
In Larne, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £50,500–£77,500. The guide for Larne reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £35,000–£54,000 |
| Typical project (36 m²) | £50,500–£77,500 |
| Larger project (50 m²) | £70,000–£107,500 |
| Rate per m² | £1,400–£2,150 |
The biggest cost drivers are:
- Total floor area across both floors
- Steel beams where walls are opened up
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a double-storey extension in Larne?
Before anything is built in Larne, we confirm which approvals apply in Northern Ireland. In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Design drawings and planning application
- Structural engineer’s calculations
- Building control sign-off
- Opening up at both levels with steel beams
- Electrics, heating, plumbing and plastering
- Brick or block walls, floors and a roof tied into the house
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Larne
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
Our Larne coverage includes postcode districts BT40, and we also work in nearby places such as Carrickfergus, Newtownabbey and Bangor.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about double-storey extensions in Larne
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How much does a double-storey extension cost in Larne?
In Larne, a double-storey extension typically costs £1,400–£2,150 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £50,500–£77,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a double-storey extension in Larne?
In Northern Ireland an extension of more than one storey can be permitted development at the rear if it projects no more than 3 metres and is at least 7 metres from the rear boundary. Two-storey side extensions, and any in a conservation area, need planning permission.
How long does a double-storey extension take in Larne?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.