Double-storey extensions in Lichfield

We take on double-storey extensions in Lichfield, about 15 miles south-east of Stafford, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Lichfield

£1,600–£2,400 per m² of floor area (both floors)

In Lichfield, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Lichfield?

In Lichfield, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Prices in the West Midlands sit near the national average for this kind of work, and the range for Lichfield reflects that. Design, structural calculations and council fees are extra.

Guide prices for Lichfield, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£40,000–£60,000
Typical project (36 m²)£57,500–£86,500
Larger project (50 m²)£80,000–£120,000
Rate per m²£1,600–£2,400

The main things that change the cost:

  • Brick matching and external finishes
  • Scaffolding and access to the rear
  • Total floor area across both floors
  • Bathrooms or en-suites on the first floor

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a double-storey extension in Lichfield?

Before anything is built in Lichfield, we confirm which approvals apply in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

From survey to sign-off, the job normally involves:

  • Electrics, heating, plumbing and plastering
  • Foundations, drainage and scaffolding
  • Design drawings and planning application
  • Windows, doors and staircase alterations
  • Structural engineer’s calculations
  • Building control sign-off

How long does it take?

Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Lichfield

Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.

Projects in Lichfield (WS13) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in Lichfield

Is a double-storey extension cheaper per square metre?

Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.

What drawings do I need?

Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.

How close can it be to my neighbour?

Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.

How long does a double-storey extension take in Lichfield?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

How much does a double-storey extension cost in Lichfield?

In Lichfield, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.