What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Milford Haven?
In Milford Haven, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £54,000–£83,000. Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Milford Haven. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £37,500–£57,500 |
| Typical project (36 m²) | £54,000–£83,000 |
| Larger project (50 m²) | £75,000–£115,000 |
| Rate per m² | £1,500–£2,300 |
The biggest cost drivers are:
- Brick matching and external finishes
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
- Steel beams where walls are opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Milford Haven?
The approval route for Milford Haven is set by planning law in Wales. In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Structural engineer’s calculations
- Opening up at both levels with steel beams
- Brick or block walls, floors and a roof tied into the house
- Design drawings and planning application
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Milford Haven
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
We work across Milford Haven and neighbouring areas such as Pembroke Dock, Haverfordwest and Carmarthen. Postcodes we cover in Milford Haven include SA73.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Milford Haven
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
How much does a double-storey extension cost in Milford Haven?
In Milford Haven, a double-storey extension typically costs £1,500–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £54,000–£83,000. Your fixed price depends on the survey and drawings.
Who approves a double-storey extension in Milford Haven?
Planning matters in Milford Haven go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do I need planning permission for a double-storey extension in Milford Haven?
In Wales a rear extension of more than one storey can be permitted development if the ground floor projects no more than 4 metres and the upper floor no more than 3 metres, with at least 10.5 metres to the rear boundary and obscure-glazed upper side windows. It is not permitted development in conservation areas, National Parks or National Landscapes, so many double-storey extensions need a householder application.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How close can it be to my neighbour?