The LothiansDouble-storey extensions

Double-storey extensions in Musselburgh

We take on double-storey extensions in Musselburgh, about 18 miles east of Livingston, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Musselburgh

£1,600–£2,400 per m² of floor area (both floors)

In Musselburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a double-storey extension?

Double-storey rear extension in buff brick with a glass Juliet balcony and wide glazed doors

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.

How much does a double-storey extension cost in Musselburgh?

In Musselburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Building costs in Scotland are close to the UK average, so the figures for Musselburgh are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Musselburgh, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (25 m²)£40,000–£60,000
Typical project (36 m²)£57,500–£86,500
Larger project (50 m²)£80,000–£120,000
Rate per m²£1,600–£2,400

Your quote will depend mainly on:

  • Total floor area across both floors
  • Bathrooms or en-suites on the first floor
  • Roof design and how it joins the existing roof
  • Brick matching and external finishes

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a double-storey extension in Musselburgh?

The approval route for Musselburgh is set by planning law in Scotland. In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical double-storey extension we handle:

  • Building control sign-off
  • Foundations, drainage and scaffolding
  • Design drawings and planning application
  • Windows, doors and staircase alterations
  • Electrics, heating, plumbing and plastering
  • Structural engineer’s calculations

How long does it take?

Build time is typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Musselburgh

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Musselburgh sits in the Lothians, about 18 miles east of Livingston. We cover the whole of Musselburgh, including postcodes EH21.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about double-storey extensions in Musselburgh

What drawings do I need?

Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.

Do I need planning permission for a double-storey extension in Musselburgh?

In Scotland an extension of more than one storey is only permitted development if it is at least 10 metres from every boundary and no higher than the existing ridge, so most need planning permission. A building warrant is needed before work starts.

How much does a double-storey extension cost in Musselburgh?

In Musselburgh, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.

How long does a double-storey extension take in Musselburgh?

Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.

How close can it be to my neighbour?

Councils look at loss of light and outlook for neighbours. Many apply a 45-degree guideline from the nearest neighbouring window. We design to the council’s published guidance to give the application the best chance.

Can I live at home during the work?

Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.

Tell us about your project in Musselburgh and we will arrange a free home visit.