What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Norwich?
In Norwich, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £63,000–£95,500. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £44,000–£66,000 |
| Typical project (36 m²) | £63,000–£95,500 |
| Larger project (50 m²) | £87,500–£132,500 |
| Rate per m² | £1,750–£2,650 |
Your quote will depend mainly on:
- Steel beams where walls are opened up
- Bathrooms or en-suites on the first floor
- Scaffolding and access to the rear
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Norwich?
The approval route for Norwich is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Foundations, drainage and scaffolding
- Design drawings and planning application
- Building control sign-off
- Electrics, heating, plumbing and plastering
- Opening up at both levels with steel beams
- Windows, doors and staircase alterations
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Norwich
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Norwich sits in Norfolk. We cover the whole of Norwich, including postcodes NR2, NR3 and NR99.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Norwich
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
How much does a double-storey extension cost in Norwich?
In Norwich, a double-storey extension typically costs £1,750–£2,650 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £63,000–£95,500. Your fixed price depends on the survey and drawings.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How long does a double-storey extension take in Norwich?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.