What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Shipley?
In Shipley, a double-storey extension typically costs £1,550–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £56,000–£83,000. Building costs in Yorkshire and the Humber run about 7% below the UK average, and the figures for Shipley are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £39,000–£57,500 |
| Typical project (36 m²) | £56,000–£83,000 |
| Larger project (50 m²) | £77,500–£115,000 |
| Rate per m² | £1,550–£2,300 |
Your quote will depend mainly on:
- Total floor area across both floors
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
- Steel beams where walls are opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Shipley?
Here is how the rules work for a double-storey extension in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most double-storey extensions:
- Windows, doors and staircase alterations
- Opening up at both levels with steel beams
- Foundations, drainage and scaffolding
- Design drawings and planning application
- Structural engineer’s calculations
- Electrics, heating, plumbing and plastering
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Shipley
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
From BD18 outwards, we take on projects throughout Shipley and the surrounding parts of West Yorkshire.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Shipley
Do you build double-storey extensions in Shipley?
Yes. We build double-storey extensions across Shipley, including postcodes BD18. Every project starts with a free home visit.
How much does a double-storey extension cost in Shipley?
In Shipley, a double-storey extension typically costs £1,550–£2,300 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £56,000–£83,000. Your fixed price depends on the survey and drawings.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
