What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Shropshire?
In Shropshire, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £57,500–£86,500. Building costs in the West Midlands are close to the UK average, so the figures for Shropshire are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £40,000–£60,000 |
| Typical project (36 m²) | £57,500–£86,500 |
| Larger project (50 m²) | £80,000–£120,000 |
| Rate per m² | £1,600–£2,400 |
The main things that change the cost:
- Total floor area across both floors
- Scaffolding and access to the rear
- Bathrooms or en-suites on the first floor
- Roof design and how it joins the existing roof
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Shropshire?
The approval route for Shropshire is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Foundations, drainage and scaffolding
- Design drawings and planning application
- Opening up at both levels with steel beams
- Building control sign-off
- Brick or block walls, floors and a roof tied into the house
- Windows, doors and staircase alterations
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Shropshire
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Towns we cover in Shropshire include Telford, Shrewsbury, Loughton, Wellington and Oswestry.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about double-storey extensions in Shropshire
How much does a double-storey extension cost in Shropshire?
In Shropshire, a double-storey extension typically costs £1,600–£2,400 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £57,500–£86,500. Your fixed price depends on the survey and drawings.
How long does a double-storey extension take in Shropshire?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
Does a double-storey extension need planning permission?
Usually. In England a two-storey rear extension can only be permitted development if it is no more than 3 metres deep and at least 7 metres from the rear boundary, and side extensions over one storey always need permission. In practice most are approved through a planning application.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
