What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Trowbridge?
In Trowbridge, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £61,000–£92,000. Prices in the South West sit near the national average for this kind of work, and the range for Trowbridge reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £42,500–£64,000 |
| Typical project (36 m²) | £61,000–£92,000 |
| Larger project (50 m²) | £85,000–£127,500 |
| Rate per m² | £1,700–£2,550 |
Your quote will depend mainly on:
- Brick matching and external finishes
- Scaffolding and access to the rear
- Steel beams where walls are opened up
- Total floor area across both floors
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a double-storey extension in Trowbridge?
Whether you need planning permission depends on your house and its location in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical double-storey extension we handle:
- Windows, doors and staircase alterations
- Foundations, drainage and scaffolding
- Structural engineer’s calculations
- Opening up at both levels with steel beams
- Electrics, heating, plumbing and plastering
- Building control sign-off
How long does it take?
Build time is typically 14 to 20 weeks on site, after planning and building control approval. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Trowbridge
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Projects in Trowbridge (BA14) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Trowbridge
How much does a double-storey extension cost in Trowbridge?
In Trowbridge, a double-storey extension typically costs £1,700–£2,550 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £61,000–£92,000. Your fixed price depends on the survey and drawings.
Is a double-storey extension cheaper per square metre?
Usually yes. You pay for one set of foundations and one roof but get two floors of space, so the cost per square metre is often lower than a single-storey extension.
How long does a double-storey extension take in Trowbridge?
Typically 14 to 20 weeks on site, after planning and building control approval. Design and approvals beforehand usually take 3 to 4 months.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
