What is a double-storey extension?

A double-storey extension (also called a two-storey extension) adds rooms on both the ground and first floor in one build. It typically gives a larger kitchen or living space downstairs and an extra bedroom or bathroom above.
How much does a double-storey extension cost in Weybridge?
In Weybridge, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). For a typical 36 m² project that is roughly £66,500–£101,000. The guide for Weybridge reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (25 m²) | £46,000–£70,000 |
| Typical project (36 m²) | £66,500–£101,000 |
| Larger project (50 m²) | £92,500–£140,000 |
| Rate per m² | £1,850–£2,800 |
The main things that change the cost:
- Roof design and how it joins the existing roof
- Scaffolding and access to the rear
- Steel beams where walls are opened up
- Brick matching and external finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a double-storey extension in Weybridge?
The approval route for Weybridge is set by planning law in England. In England an extension of more than one storey can only be permitted development at the rear, no more than 3 metres deep and at least 7 metres from the rear boundary, with matching materials and any upper side windows obscure-glazed. Most double-storey extensions therefore go through a householder planning application.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a double-storey extension:
- Structural engineer’s calculations
- Windows, doors and staircase alterations
- Design drawings and planning application
- Opening up at both levels with steel beams
- Building control sign-off
- Foundations, drainage and scaffolding
How long does it take?
The build itself usually takes 14 to 20 weeks on site, after planning and building control approval. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Weybridge
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Weybridge sits in Surrey, about 11 miles north-east of Guildford. We cover the whole of Weybridge, including postcodes KT13.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about double-storey extensions in Weybridge
What drawings do I need?
Planning drawings for the application, then more detailed building regulations drawings and structural calculations for building control. We prepare both.
How much does a double-storey extension cost in Weybridge?
In Weybridge, a double-storey extension typically costs £1,850–£2,800 per m² of floor area (both floors), including VAT at 20% (standard rate). A typical 36 m² project comes to roughly £66,500–£101,000. Your fixed price depends on the survey and drawings.
Will the first floor need a new staircase?
Not normally. The new rooms are reached from the existing landing, though a doorway or short corridor may need to be formed.
Who approves a double-storey extension in Weybridge?
Planning matters in Weybridge go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can I live at home during the work?
Most families stay put. The shell is built first and the house is opened up late in the job, so disruption inside is limited to a few weeks.
