What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Aberdeen and Grampian?
In Aberdeen and Grampian, a glazed extension typically costs £2,700–£4,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £48,500–£73,000. Building costs in Scotland are close to the UK average, so the figures for Aberdeen and Grampian are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £35,000–£52,500 |
| Typical project (18 m²) | £48,500–£73,000 |
| Larger project (25 m²) | £67,500–£101,000 |
| Rate per m² | £2,700–£4,050 |
Your quote will depend mainly on:
- Steel framing
- Glazing size, specification and lead time
- Cladding material
- Overheating and energy design
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a glazed extension in Aberdeen and Grampian?
Here is how the rules work for a glazed extension in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off
- Electrics, heating and finishes
- Cladding or render finish
- Contemporary design and planning drawings
- Large-format sliding doors and fixed glazing
- Structural design for steel frames and glass supports
How long does it take?
Build time is typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Aberdeen and Grampian
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Towns we cover in Aberdeen and Grampian include Aberdeen, Elgin, Peterhead, Inverurie, Fraserburgh and Westhill.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about glazed extensions in Aberdeen and Grampian
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
How much does a glazed extension cost in Aberdeen and Grampian?
In Aberdeen and Grampian, a glazed extension typically costs £2,700–£4,050 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £48,500–£73,000. Your fixed price depends on the survey and drawings.
Is triple glazing necessary?
Not always. High-performance double glazing can meet the standards; triple glazing helps in exposed locations.
Do I need planning permission for a glazed extension in Aberdeen and Grampian?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
How long does a glazed extension take in Aberdeen and Grampian?
Typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Design and approvals beforehand usually take 3 to 4 months.
Will a glass extension be too hot in summer?
It can be if poorly designed. Solar-control glass, roof overhangs and opening vents reduce overheating, and building regulations may require calculations to show the design works.