What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Caldicot?
In Caldicot, a glazed extension typically costs £2,600–£3,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £47,000–£69,500. Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Caldicot. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £34,000–£50,000 |
| Typical project (18 m²) | £47,000–£69,500 |
| Larger project (25 m²) | £65,000–£96,000 |
| Rate per m² | £2,600–£3,850 |
The main things that change the cost:
- Lighting and finishes
- Access for large glass panels
- Overheating and energy design
- Steel framing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a glazed extension in Caldicot?
Before anything is built in Caldicot, we confirm which approvals apply in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Electrics, heating and finishes
- Large-format sliding doors and fixed glazing
- Energy and overheating calculations where needed
- Contemporary design and planning drawings
- Building control sign-off
- Cladding or render finish
How long does it take?
Build time is typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Caldicot
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Projects in Caldicot (NP26) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about glazed extensions in Caldicot
Will a glass extension be too hot in summer?
It can be if poorly designed. Solar-control glass, roof overhangs and opening vents reduce overheating, and building regulations may require calculations to show the design works.
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
Can large glass panels be lifted in?
Some need a crane or glass-lifting robot. We plan access during design.
How much does a glazed extension cost in Caldicot?
In Caldicot, a glazed extension typically costs £2,600–£3,850 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £47,000–£69,500. Your fixed price depends on the survey and drawings.
How long does a glazed extension take in Caldicot?
Typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Design and approvals beforehand usually take 3 to 4 months.
Do I need planning permission for a glazed extension in Caldicot?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
