What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Erskine?
In Erskine, a glazed extension typically costs £2,700–£4,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £48,500–£73,000. Building costs in Scotland are close to the UK average, so the figures for Erskine are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £35,000–£52,500 |
| Typical project (18 m²) | £48,500–£73,000 |
| Larger project (25 m²) | £67,500–£101,000 |
| Rate per m² | £2,700–£4,050 |
What moves the price most:
- Lighting and finishes
- Access for large glass panels
- Overheating and energy design
- Steel framing
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a glazed extension in Erskine?
The approval route for Erskine is set by planning law in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Energy and overheating calculations where needed
- Large-format sliding doors and fixed glazing
- Electrics, heating and finishes
- Structural design for steel frames and glass supports
- Contemporary design and planning drawings
- Building control sign-off
How long does it take?
The build itself usually takes 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Erskine
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Our Erskine coverage includes postcode districts PA8, and we also work in nearby places such as Clydebank, Renfrew and Bearsden.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about glazed extensions in Erskine
Who approves a glazed extension in Erskine?
Planning matters in Erskine go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
How much does a glazed extension cost in Erskine?
In Erskine, a glazed extension typically costs £2,700–£4,050 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £48,500–£73,000. Your fixed price depends on the survey and drawings.
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
Is triple glazing necessary?
Not always. High-performance double glazing can meet the standards; triple glazing helps in exposed locations.
How long do large glass panels take to arrive?
Often 6 to 10 weeks after final measurements, so we order them as soon as the structure is built.
Do I need planning permission for a glazed extension in Erskine?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.