What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Pitsea?
In Pitsea, a glazed extension typically costs £2,950–£4,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £53,000–£80,000. That range is adjusted for the East of England, where domestic building work typically costs around 6% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £38,500–£58,000 |
| Typical project (18 m²) | £53,000–£80,000 |
| Larger project (25 m²) | £74,000–£111,000 |
| Rate per m² | £2,950–£4,450 |
The main things that change the cost:
- Glazing size, specification and lead time
- Steel framing
- Overheating and energy design
- Access for large glass panels
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a glazed extension in Pitsea?
Approvals for a glazed extension in Pitsea follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Large-format sliding doors and fixed glazing
- Foundations, walls and insulated roof
- Electrics, heating and finishes
- Energy and overheating calculations where needed
- Building control sign-off
- Cladding or render finish
How long does it take?
Build time is typically 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Pitsea
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
We work across Pitsea and neighbouring areas such as Basildon, South Benfleet and Wickford. Postcodes we cover in Pitsea include SS13.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about glazed extensions in Pitsea
Is triple glazing necessary?
Not always. High-performance double glazing can meet the standards; triple glazing helps in exposed locations.
How much does a glazed extension cost in Pitsea?
In Pitsea, a glazed extension typically costs £2,950–£4,450 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £53,000–£80,000. Your fixed price depends on the survey and drawings.
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
Who approves a glazed extension in Pitsea?
Planning matters in Pitsea go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long do large glass panels take to arrive?
Often 6 to 10 weeks after final measurements, so we order them as soon as the structure is built.