What is a glazed extension?

A glazed or contemporary extension uses large panes of glass, slim aluminium frames and modern cladding to create a bright room that contrasts with the original house. Frameless corners, structural glass roofs and minimal sliding doors are typical features.
How much does a glazed extension cost in Powys?
In Powys, a glazed extension typically costs £2,600–£3,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 18 m² project that is roughly £47,000–£69,500. The guide for Powys reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (13 m²) | £34,000–£50,000 |
| Typical project (18 m²) | £47,000–£69,500 |
| Larger project (25 m²) | £65,000–£96,000 |
| Rate per m² | £2,600–£3,850 |
Your quote will depend mainly on:
- Steel framing
- Access for large glass panels
- Overheating and energy design
- Glazing size, specification and lead time
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a glazed extension in Powys?
Here is how the rules work for a glazed extension in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Energy and overheating calculations where needed
- Electrics, heating and finishes
- Structural design for steel frames and glass supports
- Cladding or render finish
- Large-format sliding doors and fixed glazing
- Building control sign-off
How long does it take?
Expect 12 to 16 weeks on site; glazing lead times can be 6 to 10 weeks. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Powys
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Towns we cover in Powys include Newtown, Brecon, Welshpool and Llandrindod Wells.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about glazed extensions in Powys
Do you build glazed extensions in Powys?
Yes. We build glazed extensions across Powys, including postcodes CF44, CF48, HR3, HR5 and LD1. Every project starts with a free home visit.
How much does a glazed extension cost in Powys?
In Powys, a glazed extension typically costs £2,600–£3,850 per m² of floor area, including VAT at 20% (standard rate). A typical 18 m² project comes to roughly £47,000–£69,500. Your fixed price depends on the survey and drawings.
Is VAT charged?
Yes, VAT at the standard 20% rate applies to extensions. Our guide prices include it.
Do I need planning permission for a glazed extension in Powys?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Will a glass extension be too hot in summer?
It can be if poorly designed. Solar-control glass, roof overhangs and opening vents reduce overheating, and building regulations may require calculations to show the design works.
How long do large glass panels take to arrive?
Often 6 to 10 weeks after final measurements, so we order them as soon as the structure is built.