What is a hip-to-gable loft conversion?

A hip-to-gable loft conversion replaces the sloping side (the hip) of a semi-detached or detached roof with a vertical gable wall. This extends the ridge and creates enough space for a staircase and a full-size room, usually combined with a rear dormer.
How much does a hip-to-gable loft conversion cost in Borehamwood?
In Borehamwood, a hip-to-gable loft conversion typically costs £58,500–£82,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Borehamwood. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A hip-to-gable with rear dormer | £58,500–£82,500 |
| Higher specification | £82,500–£103,000 |
What moves the price most:
- Roof tile matching
- Gable wall construction and finish
- Staircase design
- Size of the rear dormer
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a hip-to-gable loft conversion in Borehamwood?
Whether you need planning permission depends on your house and its location in England. In England a hip-to-gable conversion is often permitted development within the 50 cubic metre roof volume limit for semi-detached and detached houses, provided the gable does not face a road and the house is not in a conservation area.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a hip-to-gable loft conversion:
- Staircase and fire-safe escape route
- Survey and planning check
- Steel beams and floor joists
- Insulation, electrics, plumbing and plastering
- Gable wall built in brick or block and finished to match
- Drawings and structural calculations
How long does it take?
Expect 7 to 10 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Borehamwood
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Borehamwood sits in Hertfordshire, about 13 miles south-west of Hertford. We cover the whole of Borehamwood, including postcodes WD6.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about hip-to-gable loft conversions in Borehamwood
How much does a hip-to-gable loft conversion cost in Borehamwood?
In Borehamwood, a hip-to-gable loft conversion typically costs £58,500–£82,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Is a hip-to-gable better than a dormer?
On a hipped roof, a dormer alone often leaves too little space for stairs. Combining hip-to-gable with a rear dormer gives the most room.
Is a hip-to-gable conversion permitted development?
Often yes in England, within the 50 cubic metre roof volume limit for semi-detached and detached houses. It is not permitted development in conservation areas or where rights have been removed.
Can the gable be brick?
Yes. We match the existing finish, whether brick, render or pebbledash.
How long does a hip-to-gable loft conversion take in Borehamwood?
Typically 7 to 10 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.