What is a hip-to-gable loft conversion?

A hip-to-gable loft conversion replaces the sloping side (the hip) of a semi-detached or detached roof with a vertical gable wall. This extends the ridge and creates enough space for a staircase and a full-size room, usually combined with a rear dormer.
How much does a hip-to-gable loft conversion cost in Leamington Spa?
In Leamington Spa, a hip-to-gable loft conversion typically costs £53,500–£75,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Building costs in the West Midlands are close to the UK average, so the figures for Leamington Spa are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A hip-to-gable with rear dormer | £53,500–£75,500 |
| Higher specification | £75,500–£94,500 |
The biggest cost drivers are:
- Scaffolding to three sides
- Size of the rear dormer
- Staircase design
- Roof tile matching
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a hip-to-gable loft conversion in Leamington Spa?
The approval route for Leamington Spa is set by planning law in England. In England a hip-to-gable conversion is often permitted development within the 50 cubic metre roof volume limit for semi-detached and detached houses, provided the gable does not face a road and the house is not in a conservation area.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical hip-to-gable loft conversion we handle:
- Insulation, electrics, plumbing and plastering
- Roof extension and rear dormer
- Building control sign-off
- Gable wall built in brick or block and finished to match
- Staircase and fire-safe escape route
- Steel beams and floor joists
How long does it take?
Allow 7 to 10 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Leamington Spa
The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.
From CV31 outwards, we take on projects throughout Leamington Spa and the surrounding parts of Warwickshire.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about hip-to-gable loft conversions in Leamington Spa
Can the gable be brick?
Yes. We match the existing finish, whether brick, render or pebbledash.
Will I need building regulations approval?
Yes. All loft conversions to habitable rooms need building control approval for structure, fire safety, insulation and stairs.
How long does a hip-to-gable loft conversion take in Leamington Spa?
Typically 7 to 10 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a hip-to-gable loft conversion cost in Leamington Spa?
In Leamington Spa, a hip-to-gable loft conversion typically costs £53,500–£75,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Will it look strange next to my neighbour?
On a pair of semis the roofs will no longer match unless your neighbour does the same. Many streets already have several converted roofs.
