What is a hip-to-gable loft conversion?

A hip-to-gable loft conversion replaces the sloping side (the hip) of a semi-detached or detached roof with a vertical gable wall. This extends the ridge and creates enough space for a staircase and a full-size room, usually combined with a rear dormer.
How much does a hip-to-gable loft conversion cost in Waterlooville?
In Waterlooville, a hip-to-gable loft conversion typically costs £61,500–£87,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A hip-to-gable with rear dormer | £61,500–£87,500 |
| Higher specification | £87,500–£109,500 |
Your quote will depend mainly on:
- Size of the rear dormer
- Gable wall construction and finish
- Roof tile matching
- Bathroom and plumbing
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a hip-to-gable loft conversion in Waterlooville?
Approvals for a hip-to-gable loft conversion in Waterlooville follow the rules for England. In England a hip-to-gable conversion is often permitted development within the 50 cubic metre roof volume limit for semi-detached and detached houses, provided the gable does not face a road and the house is not in a conservation area.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical hip-to-gable loft conversion we handle:
- Insulation, electrics, plumbing and plastering
- Roof extension and rear dormer
- Drawings and structural calculations
- Gable wall built in brick or block and finished to match
- Building control sign-off
- Survey and planning check
How long does it take?
Expect 7 to 10 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Waterlooville
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Waterlooville sits in Hampshire, about 18 miles south-east of Winchester. We cover the whole of Waterlooville, including postcodes PO7.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about hip-to-gable loft conversions in Waterlooville
Can the gable be brick?
Yes. We match the existing finish, whether brick, render or pebbledash.
Is a hip-to-gable conversion permitted development?
Often yes in England, within the 50 cubic metre roof volume limit for semi-detached and detached houses. It is not permitted development in conservation areas or where rights have been removed.
How much does a hip-to-gable loft conversion cost in Waterlooville?
In Waterlooville, a hip-to-gable loft conversion typically costs £61,500–£87,500 for a hip-to-gable with rear dormer, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Is a hip-to-gable better than a dormer?
On a hipped roof, a dormer alone often leaves too little space for stairs. Combining hip-to-gable with a rear dormer gives the most room.
How long does a hip-to-gable loft conversion take in Waterlooville?
Typically 7 to 10 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
