What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Altrincham?
In Altrincham, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£153,000. The guide for Altrincham reflects typical costs in the North West, roughly 6% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£107,000 |
| Typical project (90 m²) | £76,500–£153,000 |
| Larger project (126 m²) | £107,000–£214,000 |
| Rate per m² | £850–£1,700 |
What moves the price most:
- Extent of rewiring and replumbing
- Windows and doors
- Finishes
- Kitchens and bathrooms
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a house renovation in Altrincham?
Here is how the rules work for a house renovation in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a house renovation:
- Plastering and boarding
- Structural repairs and damp treatment
- Decoration
- Kitchens and bathrooms
- Building control for notifiable work
- Condition survey and scope of works
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Altrincham
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
If your home is in Altrincham or close by in Sale, Urmston and Stretford, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Altrincham
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do I need planning permission to renovate?
Internal work usually does not need planning permission unless the house is listed. External changes may.
How much does a house renovation cost in Altrincham?
In Altrincham, a house renovation typically costs £850–£1,700 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£153,000. Your fixed price depends on the survey and drawings.
How long does a house renovation take in Altrincham?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
